UC Davis Hospital Bed Replacement Tower Make Ready

Sacramento, California
  • Client/Owner

    UC Davis Health

  • Completion Date

    January 2024

  • Duration

    27 Months

  • General Contractor

    McCarthy Building Companies

This design-assist project for a new hospital tower included a Make Ready reroute of the existing chilled water, hot water, and electrical infrastructure, which served the existing active hospital to vacate the footprint of the future building. Extensive investigation was necessary to determine routing in a very congested underground setting. Substantial Investigation and design of shoring systems to support existing mission-critical hospital infrastructure during new excavation was necessary. New HHW/CHW hydronic piping will serve the new hospital building. The pipe product was pre-insulated welded steel pipe supplied by Thermacor. Installation was a phased installation to meet UCD Health’s construction program and hospital ingress/egress.

Market Sectors

Let’s Connect

Whether you have an inquiry about our services, pricing, needing engineering expertise, or anything else, our team is ready to answer all of your questions.

Contact Us

How We Help You

We take the time to learn about your specific needs and pain points to develop solutions that will have the greatest impact. Select a role below and see how Preston can support your needs!

Connect With Us

  • Site By