NEI Pump Station
-
Client/Owner
Prologis
-
Completion Date
September 2023
-
Duration
8 Months
The NEI Pump Station project was completed for Prologis to expand stormwater infrastructure serving a major logistics and industrial development in Tracy, California. Preston Pipelines served as both general contractor and utility installer, providing turnkey delivery of critical stormwater improvements to support long-term site development.
The scope of work included installation of a new storm drain force main, construction of a storm drain pump station, and upgrades to an existing detention basin. These improvements increased the site’s stormwater management capacity, improved system reliability, and supported continued industrial growth within the development.
Market Sectors
Companies
Let’s Connect