UC Davis Hospital Bed Replacement Tower

Sacramento, California
  • Client/Owner

    UC Davis Health

  • Completion Date

    January 2024

  • Duration

    27 Months

  • General Contractor

    McCarthy Building Companies

As part of UC Davis Health’s campus expansion, the Hospital Bed Replacement Tower project involved a critical design-assist scope to prepare for a new hospital tower. Preston Pipelines played a key role in the Make Ready phase, which included rerouting existing chilled water, hot water, and electrical infrastructure that served the active hospital, freeing up the site for new construction without disrupting operations.

Working in a highly congested underground environment, extensive investigation and precise coordination were required to determine routing and design shoring systems that would protect mission-critical utilities during excavation. The project also included phased installation of new pre-insulated, welded steel hydronic piping (HHW/CHW), supplied by Thermacor, to serve the future hospital tower. Installation was carefully sequenced to align with UC Davis Health’s construction timeline and maintain uninterrupted hospital access.

Market Sectors

Let’s Connect

Whether you have an inquiry about our services, pricing, needing engineering expertise, or anything else, our team is ready to answer all of your questions.

Contact Us

How We Help You

We take the time to learn about your specific needs and pain points to develop solutions that will have the greatest impact. Select a role below and see how Preston can support your needs!

Connect With Us

  • Site By